Individual Production Permits

Individual Production Permits (IPPs) are required for nonexempt wells intended for uses such as, but not limited to, public water supply, commercial use, non-residential irrigation, and industrial use.

Please review the information below to determine the appropriate permitting pathway for your proposed well.

Individual Production Permits

The required permitting process for nonexempt wells depends on the anticipated annual groundwater production volume. Select the appropriate tab below to determine which application(s) are required for the proposed well.

Test Class

Aquifer Test and Report Requirements

Anticipated Production Volume

0

None

<650,000 gallons per year for Trinity Aquifer

OR

<2,000,000 gallons per year
for Edwards Aquifer

1

Abbreviated
aquifer test and Report

650,000 to 2,000,000 gallons per year for the Trinity Aquifer

OR

2,000,000 to 12,000,000 gallons per year for the Edwards Aquifer

 

2

Hydrogeologic Report, and
aquifer test may require installation of new scientific monitor wells
if existing wells are not available or adequate for monitoring.

2,000,000 to 40,000,000 gallons per year for the Trinity Aquifer

OR

12,000,000 to 40,000,000 gallons per year for the Edwards Aquifer

3

Hydrogeologic Report,
and aquifer test

will require monitoring well network plan and
installation of one or more scientific monitor wells.

>40,000,000 gallons per year for all aquifers