Deciding What Permits & Forms You Need

A permit is required to drill any new well within the District. The type of permit required depends on several factors, including the intended use of the well, the property’s acreage, the aquifer from which water will be produced, and the anticipated annual production volume. The steps outlined on this page will help you determine the appropriate permit for your well and identify the application materials required.

Step 1: See if You’re Located in the District

Outline of a map showing the boundaries of the District from south Austin to south San Marcos

The District is responsible for managing and permitting groundwater wells within its boundaries. Within the Original Territory, the District manages and permits wells completed in all aquifers, including the Edwards, Trinity, alluvial, and chalk aquifers. Within the southern Shared Territory, the District’s management and permitting responsibilities include all of these aquifers except the Edwards Aquifer, which is managed by the Edwards Aquifer Authority.

  • If you’re unsure if you’re located in the District, click below to use our interactive map. You can enter an address and find out if your well falls within our territory. 

Step 2: Which of the Following Do You Need?

Permit for a New Well

Need a permit to drill a new well in the District? Scroll down to find out what specific type of form you need.

Permit to Plug or Cap a Well

Click on the button relevant to your type of well that needs to be plugged or capped.

Register an Existing Well

Interested in registering an existing well or obtaining a Production Permit? Click below!

Step 3: Narrow Down the Type of Permit

From left to right, click on and review the criteria of the tabs below to see which type of well application you need.

Need Additional Assistance?

Contact Erin Swanson, Regulatory Compliance Manager, at eswanson@bseacd.org or Jacob Newton, Regulatory Compliance Coordinator, at jnewton@bseacd.org.